Idaho National Laboratory is seeking a hydropower utility to collaborate on a case study to understand how small hydroelectric plants operating at 10 megawatts or less can be upgraded to provide emergency power to critical loads during outages.
Join the American Public Power Association (APPA) and the Tennessee Valley Authority (TVA) on May 28, 2024, from 2 – 3 pm EST
The PJM Interconnection and the Midcontinent Independent System Operator on May 9 announced today that the organizations will collaborate on an informational interregional transfer capability study, set to be performed during the second half of 2024.
Texas public power utility Austin Energy recently hosted a tour and meeting with a reverse trade mission delegation from Malaysia, sponsored by the U.S. Trade and Development Agency.
Rich Wallen, Grant County PUD general manager and CEO, has announced his resignation from the Washington State public power utility. The resignation, which was given to Grant PUD’s Board of Commissioners on May 7, is effective on June 14.
The Central Nebraska Public Power and Irrigation District board of directors on May 6 approved a new contract for power generated at the Jeffrey Hydro plant south of Brady, Neb. The approved agreement is with the Municipal Energy Agency of Nebraska and will run from July 1, 2024, through December 31, 2024.