Contracts and Rate Design for Data Centers
This presentation will address the latest developments regarding the interconnection of these large loads and will include detailed discussion of:
the players, and the games they play when engaging public power entities regarding the interconnection of these large loads; and
the necessary agreements and the operative terms and conditions in those agreements that will ensure existing ratepayers do not subsidize the interconnection, power supply or development costs and are not stuck dealing with any stranded costs; and
the technical and policy issues that need to be considered in determining whether the “juice” from interconnecting these loads is be worth the “squeeze” on the utility and its existing ratepayers.