A ribbon cutting for a new Burbank Water and Power iron flow battery storage system scheduled for April 5 has been postponed due to an inclement weather forecast for California.
Public Power Current will provide an update on the ribbon cutting once a new date for the event is scheduled.
In a recent episode of the Public Power Now podcast, Mandip Samra, Assistant General Manager for Power Supply at Burbank Water and Power, detailed the benefits of iron flow battery storage technology.