Alabama public power utility Riviera Utilities has received $800,000 for its Coastal Wastewater Resiliency Improvement Project.

“This investment will help Riviera make improvements that add another layer of protection and resiliency to our wastewater system and the natural resources around us,” it noted.

Alabama Gov. Kay Ivey recently announced more than $52 million in GoMESA funding for 21 projects across Coastal Alabama including the Coastal Wastewater Resiliency Improvement Project.

Riviera Utilities said it is grateful to Ivey and Commissioner of Conservation Chris Blankenship “for their leadership, support, and commitment to investing in the future of Coastal Alabama,” adding: “We’re proud to play a small part in a much bigger effort to keep our coast strong, resilient, and thriving.”

GoMESA refers to the Gulf of Mexico Energy Security Act of 2006

The project involves completing bypass pumping system installations at six wastewater lift stations within the utility's service territory in Baldwin County, Alabama.

The project will provide bypass pumping systems at key mainline and relay wastewater lift stations. These improvements will significantly reduce the risk of sanitary sewer overflows during electrical disruptions, hurricanes, severe weather events, or other emergencies that could disable submersible pumps or control systems.

Each site is anticipated to include:
•    Installation of a skid-mounted bypass pump
•    Construction of a concrete equipment pad
•    Installation of suction and discharge piping
•    Connection to natural gas service for reliable backup operation
•    Associated electrical, control, and site improvements necessary to maintain uninterrupted wastewater service during emergency events.

By enhancing system redundancy and operational reliability, the project will help protect public health, safeguard environmentally sensitive coastal waters, and ensure continuity of wastewater service throughout Riviera Utilities’ service territory.

"We are thankful the state is providing funding for crucial improvements to our wastewater system," said James Wallace, Chief Administrative Officer at Riviera Utilities. "This grant will enhance the reliability of Riviera's wastewater system during hurricanes, power outages, and other emergencies. The bypass pumps will help maintain service and reduce the risk of sewer overflows. This investment strengthens the resiliency of our system and protects the communities and coastal environment we serve."
 

 

 


 

Topics