Public power utilities across the country are now planning their move from the Geometric Network to the Utility Network because support for the older technology ends in March 2028.

Both are part of a utility’s geographic information system (GIS), which combines the physical location of poles, transformers and other assets with engineering and operational data in a single source.

Esri, a U.S. software company that provides GIS software, location intelligence and mapping, created both. The nearly 30-year-old Geometric Network is the model many utilities use today to represent their systems in GIS.

The Utility Network replaces it. The network model changes, along with the software used to edit the data and the way other utility systems connect to it.

Why Utilities Are Making the Move

Lincoln Electric System (LES) is a public power utility in Nebraska which is among the many utilities making the transition. LES is working with SSP Innovations, a utility GIS consulting firm, and plans to start their project to migrate to the Utility Network in early 2027.

Virtually every division at LES uses GIS, and they’ll all be affected by the transition, said Ryan Kohn, senior manager of utility technology at LES.

Like LES, utilities should start preparing now for the move to minimize unforeseen costs, reduce delays, and ensure a smoother transition, Kohn said.

By transitioning to the Utility Network, LES will gain new capabilities and a modern platform for managing its electric system. The Utility Network provides a more detailed model of how assets are connected, supports advanced tracing and analysis, and makes network data accessible across desktop, web and mobile applications.

As electric demand grows and utility systems become more complex, the Utility Network provides the modern technology public power utilities need to maintain reliability, manage outages, and integrate renewable energy resources.

Kohn explained, "Implementing our Utility Network project is like buying a new car. A newer vehicle doesn't just replace the old one, it comes with modern features, better performance and a platform built for what's next. In the same way, our project creates a foundation that enables new capabilities and innovations that weren't possible with our legacy systems."

A Big Technology Shift

The migration to the Utility Network is a big technology shift because the legacy technology is nearly 30 years old, said David Miller, executive consultant for SSP Innovations.

“That’s a long time for a Microsoft-based application to survive without many changes. So when this shift happens, a lot changes. The way you interact with the database shifts from desktop-focused to internet- or web-focused. Systems may need to be rebuilt or refocused.”

Anything that utilities have integrated into their GIS database, including outage management systems, work and asset management, mobile applications and websites, potentially have to be rebuilt around the technology change, he said. Depending on the utility and how they use GIS, the process can take three months to five years.

Like Kohn, he stresses that utilities need to make the move to ensure they’re not falling behind by using very outdated technology. Failure to upgrade could create cybersecurity threats, for example, because unsupported software no longer receives security fixes. Older systems can also stop working when the software around them changes.

“There’s always a threat of systems breaking because we have so many patches for software and different systems coming out now. One of those patches can easily break an old legacy system,” Miller said.

Practical First Steps

To transition to the network, utilities can take some practical first steps. They should begin by creating an inventory of every system connected to GIS.

Documenting what the GIS is currently doing is critical. That’s because many utility GIS programs started as maps people referenced to identify where assets were located.

“What a lot of executives and managers have failed to recognize with their GIS system: There may be a lot of things that got added onto it that they don’t even know are there,” Miller said. For example, most outage management systems use the GIS data directly to identify where assets are, how things are connected and which customers are experiencing outages.

Miller begins a transition by focusing on how the GIS is currently being used. That involves questioning utility personnel.

“I’m sitting there talking to them and asking, ‘What are you doing day in and day out? How are you doing business? What are your rough workflows?’” he said.

He also talks to the engineering staff and field operations staff. His goal is to identify what’s tied to the GIS to ensure the transition includes all functions.

Utilities can conduct this process on their own. “They can sit down with their users,” Miller said. “There may be some things they find out that they’re not realizing people are using their data for. And that’s usually where the gotchas fall. And it’s like, ‘I didn’t have any idea we were using GIS for that process.’”

It’s also important to assess data readiness and build the migration into a broader information technology plan instead of treating GIS as a standalone project, he said.

In addition, utilities should recognize that when they’re switching out the GIS platform for something newer, connected systems change with the transition.

“Everything touching that system now has to change with it. And if you miss something, that can be a very expensive mistake,” Miller said. “Now you’ve orphaned a system that’s critical to operations and it’s not getting its data feeds anymore. Now it’s falling woefully behind on being current with what’s actually happening within the utility.”

A Chance to Update Business Processes

Moving to the Utility Network offers many GIS advantages, but it also lets utilities streamline business processes and take advantage of new technologies, Miller said.

Many utility business processes are still wrapped up in a manual, or quasi paper-based process, he noted.

“I always tell people, if you’re going to undergo this effort of changing out your GIS platform this way, I would strongly recommend you take a hard look at how you’re doing business and decide,

‘Do you want to keep operating in more legacy formats such as paper?’”

For example, many utilities have paper-based vegetation management. Workers inspect trees and mark on a map which ones need trimming. They then go back to the office and drop off the paperwork. A tree-trimming contractor picks up the paperwork, does the trim, and returns the map to the office.

“You can imagine rolling trucks back and forth just to do this type of paper shuffle takes time. You could easily take a week or two of just moving paper around and walking it through the process.”
With mobile GIS, it’s possible to use an iPad or other tablet to communicate this information.

Personnel and contractors don’t have to go into the office and pick up a map. This allows utilities to cut two weeks of shuffling maps and paper down to a day or two.

Using GIS technology this way enables more efficient, optimized work.

“Going from a 14-day turnaround to a two-day turnaround is pretty massive,” Miller said.
This also prevents personnel from losing the paper they need to shuffle around.

Preparing People for the Change

Despite the advantages of moving to the Utility Network, people often don’t like change. Miller said utilities need to focus on change management.

Change management requires training people, making them feel comfortable and including them in planning processes.

“With a technology shift, change management is critical because you could go spend the money and build an amazing technology platform, whether it’s a GIS platform or work and asset management,” Miller said. “If your stakeholders who use it day in and day out don’t trust it and don’t know about it until it just goes live, it’s going to fail spectacularly because no one’s going to want to touch it.”

Utilities should begin training key stakeholders a few months before a new system goes live. If it’s a two-year project, stakeholders should be involved in planning from the beginning. Utilities can use newsletters or email to help train them, he said.

Near the end of a two-year project, they’re more heavily involved in final testing. And utilities should keep them informed about how the changes will be rolled out and solicit feedback.
The more information people have about a big change, the more comfortable they’ll feel.

“This is a technology change, but ultimately that technology is a business system and you need to make sure the business is prepared for the technology,” Miller said.

For LES, the transition to the Utility Network is as much about people as it is about technology. Too often, utilities invest heavily in new systems but underestimate the change required for the employees who use them.

“What’s the change? Who’s being impacted? What does this mean for your daily work?” Kohn said. “SSP has a dedicated team helping us manage the transition. The success of a project like Utility Network isn’t determined by the technology alone. It depends on how well users understand, adopt and use the new tools. That’s why change management is such a critical part of the effort.”

Without educating utility personnel on the system, utilities can miss out on many advantages of transitioning to the Utility Network, Kohn said.

“We have a responsibility to ensure our users are successful through this transition, and that starts by keeping them at the center of every decision we make,” he said.

For additional information about SSP Innovations, go to www.sspinnovations.com.