Public Power Daily Logo

FERC grants one-year extension of effective date of bulk electric system definition


From the June 17, 2013 issue of Public Power Daily

Originally published June 17, 2013

By Robert Varela
Editorial Director
The Federal Energy Regulatory Commission granted a request by the North American Electric Reliability Corp. for a one-year extension (to July 1, 2014) of the effective date of the definition of "bulk electric system" recently approved by the commission. The extension of time also applies to implementation of the exception process and local distribution determinations.
 
The commission said more time is warranted so that registered entities, NERC and regional entities do not have to determine whether an element of the transmission system is eligible for inclusion or exclusion during a transition period while NERC responds to the commission’s directives "only possibly to have to re-evaluate the status of those same elements after NERC revises the definition in response to the directives."
APPA and the Transmission Access Policy Study Group (TAPS) supported an extension, but with a caveat. In a May 31 joint filing, APPA and TAPS asked the commission to clarify that the revisions to NERC’s rules of procedure submitted in conjunction with the revised definition will be permitted to take effect on July 1. However, the commission indicated that this "would unnecessarily complicate implementation of the definition and the exception process." 

Ratings

Be the first to rate this item!

Please Sign in to rate this.

Comments

  Add Your Comment

(1000 of 1000 characters remaining)

Senior Vice President, Publishing 
Jeanne Wickline LaBella
202/467-2948
JLaBella@publicpower.org

Editorial Director
Robert Varela
202/467-2947
RVarela@publicpower.org

Editor, Public Power Daily
Jeannine Anderson
202/467-2977
JAnderson@publicpower.org

Communications Assistant
Fallon W. Forbush
202/467-2958
FForbush@publicpower.org

Manager, Integrated Media 
David L. Blaylock
202/467-2946
DBlaylock@publicpower.org

Integrated Media Editor 
Laura D’Alessandro 
202/467-2955 
LDAlessandro@publicpower.org